KillaZayy4849 KillaZayy4849
  • 01-06-2021
  • Business
contestada

Describe a master budget and the sequence in which the individual budgets within the master budget are prepared.

Respuesta :

neilsimonjadormeo0
neilsimonjadormeo0 neilsimonjadormeo0
  • 03-06-2021

Answer:

The production budget is needed to figure out direct materials, direct labor and manufacturing overhead budgets. Once these are all done, then comes the finished goods inventory budget. Once all of these budgets are done, we can do a cash budget, income statement and balance sheet to finish off the process.

Explanation:

thank me later

Answer Link

Otras preguntas

3 +0.5(4a + 8) = 9 – 2a
What is the slope of the line that passing through (-2, 4) and the origin.
What is the total surface area?
(Please help if you can) If f(x) = -2x - 5 and g(x) = x4, what is (g° 0(-4)? Enter the correct answer
A fruit salad recipe calls for 2 cups of strawberries for every cup of grapes,and will serve 4 people. If Anthony wants to serve 6 people, how much ofeach ingre
i don’t understand this question what so ever
Match each function with the corresponding function formula when h(x) = 2 – 2x and g(x) = –2 x + 2.
The change from one number to the next in a geometric sequence is called the: A. common difference. B. arithmetic difference. C. common ratio. D. geometric rati
Please explain how to solve step by step. Thank you.
Assignment about Citizen and Action