Nique9953 Nique9953
  • 04-06-2020
  • Business
contestada

Project managers may be business analysts.
True
False​

Respuesta :

brianguedes23 brianguedes23
  • 04-06-2020

Answer:

True :)

hope it helps :)

Answer Link
evwing
evwing evwing
  • 04-12-2020

Answer:

Ture

Explanation:

Hope this help you

Answer Link

Otras preguntas

Given a triangle with perimeter 63 cm, one side of which is 21 cm, and one of the medians is perpendicular to one of its angle bisectors. Find the lengths of al
Name an organism in each domain: archaea, bacteria, eukarya
If (2x − 4)(3x + 2) = 0, what are all possible values of x ? Select one: A. 0 only B. −23 only C. 0 and 2 only D. −23 and 2 only
Ender and Shen are flying at each other during a battle in space. Ender moves with a velocity v1 of 12 m/s and Shen, with a mass of 45 kg, moves at a velocity v
An electric circuit through which no current flows is known as?
Marie ______ des photos quand elle voyage. fait est apprend prend
what multiplies to 1.25 and adds up to 3
A plant heterozygous for stature and fruit flesh color is pollinated by a plant that is homozygous recessive for stature and fruit flesh color. What is the phen
Which sentence correctly uses dashes for punctuation?
Parallel, intersecting or skew? AB and BC. AE and BF. EF and AD. Plane ABC and Plane ABF. Plane AED and Plane BFC. HELP!!!