it took 20 000 workers to build taj mahal in 20 years how long would it take to build if they had 8,000 workers

Respuesta :

coltongarretttanner coltongarretttanner
  • 01-05-2020

Answer:

50 years

Step-by-step explanation:

Answer Link
whyme533249
whyme533249 whyme533249
  • 01-05-2020

Answer:

160 years

Step-by-step explanation:

20/20000=0.001

0.001 x 8 x 20 = 160

Answer Link

Otras preguntas

PLEASE HELP A right rectangular prism has a length of 5 cm, a width of 4 cm, and a height of 3 cm. The dimensions of the prism are doubled. What is the surfa
what kind of training might a priest recive in a seminary
A store manager needs to run a report of last month’s sales. The manager would like the report to highlight products that sold over a quantity of twenty-five fo
Which combination forms a covalent bond
What change in the voting laws helped Jackson win the election of 1828
At a local company, the ages of all new employees hired during the last 10 years are normally distributed. The mean age is 34 years old, with a standard deviati
what is 25 1/2 × 5 –3 = 5 x
9 is what percent of 50
Look at the graph below.What is the slope of the line?​
Which type of weather technology makes use of differences in temperature?Avisible light satellitesBdoppler radarCbarometer detectorsDinfrared imagery​