matttmoney1221 matttmoney1221
  • 02-06-2016
  • Business
contestada

​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

SAT Help Jack can paint a house in 5 days, and Richard can paint the same house in 7 days. Working together, how long will it take them to finish the job? How d
If item costs $99.99 with 15% off and I get final price. It then asks me what percentage of savings. How do I get the percentage of savings
What is %15 of $35.15 What is %15 of $27.00
how could you compare the energy carried in two different longitudinal waves
The distance of a wave crest from its resting. position is its. out of A. Wavelength B. Amplitude C. Height
what is the prefix of enactment?
Evolution is: A) A change in the composition of a population from one generation to the next.B) A phenomenon that must be inferred from evidence, because it can
Use the order of operations and the digits 2,4,6 and 8 to create an expression with a value of 2
What is 9x^2-24x+ 16
how do you now 11/33 is a simplest form