jesseisom
jesseisom jesseisom
  • 01-03-2019
  • Mathematics
contestada

How much extra concrete was ordered ?

How much extra concrete was ordered class=

Respuesta :

rhondac79c79 rhondac79c79
  • 01-03-2019

Answer:

Patio size: 3 cubic yards

1 cubic yard = $140

5.) 140 x 3 = $420

Step-by-step explanation:

Answer Link

Otras preguntas

LESSON 16-1 PRACTICE 29. Leo spends $5 per week on music, a. Make a table that shows how much he spends over 4 weeks, b. Write an equation that determines the d
pls help i will rate you 5 stars Match the following. (i) Core (a) Earth’s surface (ii) Minerals (b) Used for roads and buildings (iii) Rocks (c) Made of silic
Evaluate the expression for the given value of x -7x +2 for x = -7
The graph shows the number of hours per day spent eating or drinking by a group of teenagers and the number of hours per day spent working or volunteering. A li
1) what is'Eutrophication'? A) Excessive plants growth in water and depletion of oxygenB) Adding plastic wast
Match these items. Match the items in the left column to the items in the right column. 1. Code Napoleon military dictator of England 2 coup d'état supporters o
A trolley of mass 5.0 kg is moving at 1.0 ms to the right. A constant force of 25 N acts to the left for 0.75 seconds. Calculate the change of kinetic energy of
How do paragraphs 3-4 contribute to the development of ideas in the text? (RI. 10.5)
which one is incorrect?
An object travels 20 m in 10s What is its speed?