Seudónimo Seudónimo
  • 02-06-2018
  • Mathematics
contestada

It takes 10 workers 24 hours to do a job.
Fill in the chart.

It takes 10 workers 24 hours to do a job Fill in the chart class=

Respuesta :

biggersis1968p8xgn0 biggersis1968p8xgn0
  • 02-06-2018
5 in 48 
10 in 24
20 in16
30 in12
40 in 8
50 in 4
Answer Link

Otras preguntas

What are the 3 basic rights of a worker?
Find the surface area of the cylinder. Type an exact answer in terms of pi.
What are the possible adverbs in the following word list? 15 options barely real anywhere sleepily march sure piano most scarcely fully blow sweetly never no of
What is the area for 12ft and 8.5 for a parallelogram
Alright guys i have another essay due in 2 days and my assignment description makes no sense. I am tasked to write an essay on The Omnivore's Dilemma. I have to
Which is more, 1 pound or 22 ounces?
The sum of two numbers is 41. Double the first number reduced by triple the second number is 12. What are the two numbers?
The potato originated in O A. Russia. O B. Europe. O c. America. O D. South America.
Find the area using the given image.
Identify the type of energy that is directly causing the water to boil. sorry it’s not multiple choice and I can’t take a picture of it bc I’m not on the app